Released on January 7, 2025
The user can now specify in the pane that he wants to generate the sheet even for empty tasks (task that have a selling price equal to 0). It is important in this case not to left any data in the template row because they will not be destroyed when generating the phase 1.
The user can now specify in the pane that he wants to generate the index sheet. This sheet holds the list of generated items with description, value from QDV, computed value, quantity and unit. It is not included in the phase 3 result.
Improvement: Creating a file for parent in a non-transparency mode
When creating a file for parent in a non-transparency mode, and if the user selects detailed lines, the following fields will be included as well: THROUGHPUT_PACE, LOCAL_THROUGHPUT, UNITSOFTHROUGHPUT, COMMENT_ABOUT_QUANTITY and VARIABLES_FOR_SETS.
Previously, it was possible to shift a whole row (or several) to the left or to the right, in order to change the period where a task (or several) was scheduled. From this version on, the user has to chose between ‘Global shift’, which open a sub menu and works as before, or ‘Shift’ only, which acts on the selected row(s), but also on the selected column. Selecting the forth column of a row and shifting one step will move the data from the forth column till the last column to a similar period starting at the fifth column, loosing the last data if any. Same operation is available for +1, -1, +10, and -10 steps.
In several modules, unlinking an estimate could lead to an exception because of a wrong function call. Fixed.
An error was displayed if any user defined formula in a minute field manager contained a ROUND function. This only happened if there was "No rounding" selected for Selling price in minutes in the options.